Construction

Turnkey construction: planning, contractors, timeline and quality control.

[01] Stages of work
01/
Preliminary Works (Site Preparation & Mobilization)

This stage establishes the legal and physical readiness of the site.

  • Site Fencing / Hoarding: Installation of a temporary perimeter fence around the plot.

  • Temporary Utility Connections: Provision of temporary water and electricity supply for the construction crew.

  • Site Hut and Facilities: Erection of site offices and portable toilets.

  • Site Clearance and Grubbing: Clearing the plot of shrubs, vegetation, and debris.

photo_2026-02-16_16-51-13
02/
Earthworks / Excavation
  • Cut and Excavation: Excavating soil for the foundation or basement.

  • Dewatering / Pit Emptying: Full clearing and preparation of the excavation pit.

  • Backfilling / Fill: Adding and compacting soil where the ground level needs to be raised.

  • Transport of Earth: Removal of excess soil to an authorized landfill (with certificate issuance).

photo_2026-02-16_16-51-35
03/
Foundations

The type depends on data from the geotechnical study.

  • Lean Concrete / Blinding Concrete: A base concrete layer to protect the reinforcement from the ground.

  • Footings and Tie Beams / Grade Beams: Foundation pads and connecting beams.

  • Foundation Slab / Raft Foundation: A mat foundation (often used for villas).

  • Retaining Walls: (required if the plot is sloped).

photo_2026-02-18_16-40-29
04/
Structure (Load-Bearing Frame)
  • Columns / Pillars.

  • Floors / Slabs: Inter-floor slabs (typically using beams and concrete hollow blocks – “viguetas y bovedillas”).

  • Stairs: Pouring of concrete stair flights.

photo_2026-02-18_16-34-23
05/
Sanitation and Utilities
  • Buried Sewer / Drainage: Installation of sewer pipes beneath the foundation slab.

  • Inspection Chambers / Manholes.

photo_2026-02-18_16-14-46
06/
Enclosures and Partitions
  • External Enclosure / Facade Walls: Exterior walls (typically a double layer of brick with internal insulation), SISMA system.

  • Interior Partitions: Internal walls (brick or Pladur – drywall/plasterboard).

  • Insulation: Thermal and acoustic insulation (polyurethane foam, mineral wool).

photo_2026-02-18_16-29-24
07/
Roofing and Waterproofing
  • Roof Framing / Creating Slopes: Construction of the roof truss/rafter system.

  • Waterproofing: (using bitumen membranes, PVC).

  • Roof Covering: Installation of Andalusian-style roof tiles (for pitched roofs) or gravel/paving slabs (for flat roofs).

photo_2026-02-18_16-14-50
08/
Installations (Building Systems)
  • Plumbing: Water supply system.

  • Sanitation: Internal wastewater/drainage system.

  • Electrical: Electrical installation.

  • HVAC and Ventilation: Air conditioning, ventilation, and heating systems (aerothermal, underfloor heating).

  • Telecommunications: Internet, TV, intercom, Smart Home, Fire and Intruder alarms.

  • Elevator / Lift.

photo_2026-02-18_16-14-54
09/
Finishes / Interior Finishing Works
  • Plastering: Applying plaster to walls for painting.

  • Tiling: Installing tiles in bathrooms and the kitchen.

  • Flooring: Installing floor coverings (porcelain tile, laminate).

  • Suspended Ceilings: Drywall/plasterboard false ceilings.

photo_2026-02-18_16-14-56
10/
Joinery / Carpentry
  • Exterior: Windows and entrance doors (aluminum/PVC).

  • Interior: Interior doors, built-in wardrobes/closets.

photo_2026-02-18_16-53-27
11/
Final Finishes and Fittings
  • Painting: Wall painting.

  • Sanitaryware: Installation of toilets, sinks, and faucets/taps.

  • Lighting: Installation of light fixtures.

  • Kitchen Cabinetry: Installation of fitted kitchen units.

photo_2026-02-18_16-53-11
12/
External Works / Landscaping
  • Swimming Pool.

  • External Paving: Terraces and pathways.

  • Landscaping / Gardening.

  • Perimeter Fence.

photo_2026-02-18_16-15-00
13/
Health and Safety
  • Implementation and monitoring of health and safety protocols on site.

photo_2026-02-18_16-15-02
14/
Quality Control
  • Continuous inspection and control of workmanship and materials to ensure compliance with specifications and standards.

photo_2026-02-18_16-53-39
15/
Waste Management
  • Segregation, storage, and removal of construction waste in accordance with environmental regulations.

photo_2026-02-18_16-53-56