Development

From concept to handover: land analysis, permits, budget and execution.

Step-by-step process
01/
Land Asset Management
  • Search and Acquisition: Sourcing, valuation, expert assessment, and purchase of land plots.

  • Change of Land Use / Urban Planning: Work on re-zoning land or obtaining detailed development plans if required.

  • Parcel Division: Subdividing a single large plot into multiple smaller plots for villa construction.

photo_2026-02-18_16-37-27
02/
Due Diligence

Legal Due Diligence:

  • Property Registry Check: Verification of ownership and any liens or encumbrances (mortgages, seizures).
  • Urban Planning Status: Verification of applicable building regulations with the local municipality (land designation, buildable area coefficient, maximum height).
  • Urban Development Levies: Check for any outstanding municipal debts related to infrastructure (roads, lighting).

Technical & Construction Due Diligence:

  • Geotechnical & Topographic Survey: Analysis of soil composition and topography (impacting foundation costs) and flood risk assessment.
  • Condition of Existing Structures (if applicable): Assessment of the state of existing buildings, identification of hidden defects.
  • Easements: Identification of any restrictions (e.g., underground utilities or neighbor’s right of way), also known as “red lines”.
  •  
photo_2026-02-18_16-37-28
03/
Design and Permits
  • Concept Design: Selection of architectural firms and development of initial sketches to evaluate the concept.

  • Basic Project: Preparation of project documentation for the permit application.

  • Major Building Permit: Obtaining the main construction permit (can take from 6 to 18 months depending on the region).

  • Construction Documentation: Detailed working drawings and specifications for the builders.

photo_2026-02-18_16-37-28 (2)
04/
Financing and Pre-sales
  • Business Plan: Profitability and return on investment (ROI) analysis.

  • Development Loan: Securing project financing from banks.

  • Off-Plan Sales: Launching sales based on the project design, which is often a prerequisite for bank loan approval.

images (1)
05/
Construction and Supervision
  • Tender Process: Selection of the main contractor.

  • Technical Supervision: External oversight by the project architect and technical architect.

  • Project Management: Management of schedule, budget, and work quality.

images (2)
06/
Handover and After-sales
  • Final Works Certificate: Document issued by the architects confirming that the building was constructed according to the approved project.

  • First Occupancy License: Permit from the town hall allowing occupancy.

  • Deed of New Construction: Notarization and registration of the completed construction in the Property Registry.

Handing,File,Folder